Switching Off The System Following Faults Or In Emergencies; Managing Measurements - Baur PD-TaD 62 User Manual

Portable diagnostics system
Table of Contents

Advertisement

Operating the PD-TaD 62
In operation
Prerequisites: All accesses to the test area are closed.
One or more test voltage supplies are switched on.
The red indicator light comes on.
5.2

Switching off the system following faults or in emergencies

The system's emergency off button is located on the VLF HV generator.
 In the event of a fault or an emergency, immediately press the emergency off button.
Pressing the emergency off button puts the system in the safe Ready for operation
operating state.
5.3

Managing measurements

Measurements using the PD-TaD 62 are configured and managed as follows:
Partial discharge testing
Operating steps
Switching on, releasing and deactivating the high voltage
Configuring, starting and controlling the measurements
Evaluating the measurement results
Sequential partial discharge testing, dissipation factor measurement, cable testing
Operating steps
Switching on, releasing and deactivating the high voltage
Configuring, starting and controlling the measurements
Evaluating the measurement results
* Sequential dissipation factor measurement and cable testing can be carried out via the VLF
HV generator's remote control function in the BAUR system software.
28 / 114
Operating interface
on the VLF HV generator
in the BAUR system software on the laptop
in the BAUR system software on the laptop
Operating interface
on the VLF HV generator
in the BAUR system software on the laptop*
in the BAUR system software on the laptop*
PD-TaD 62
822-187-3

Advertisement

Table of Contents
loading

Table of Contents