Meter assembly
Figure 6-13:
Step 13
14.
To install preamplifier housing hold preamplifier housing over pickup coil, connect
and hand tighten the cable connector to pickup coil. Lower explosion proof housing
over pickup coil and tighten collar nut of the quick connect union.
Installation and maintenance instructions
49