Meter assembly
Figure 6-9:
Step 9
10.
Position hanger blades in hanger hub slots to protrude enough from the flat faced
end of hanger hub to allow the outside edges of hanger blades to fit inside meter
housing bore. Slide assembly, flat faced end first into downstream bore of meter
housing and on to shaft. Push hanger blades so upstream edges are touching
downstream cone. Push hub forcing hanger blades outward contacting meter
housing bore. Rotate downstream hanger assembly lining up upstream and
downstream hanger blades. Tap downstream edges of downstream hanger blades
with a soft headed hammer to insure the blades are against the downstream cone.
Strike the downstream end hanger hub wedging and locking hanger assembly in
place.