Trace Startup Procedure - Fujitsu MB86R01 Application Note

Jade & greenhills toolchain
Table of Contents

Advertisement

4 Trace startup procedure

The following steps are necessary to configure and enable the trace functionality:
1. Power up Super Trace Probe (STP)
2. Power up the Jade Evaluation Board
3. Configure STP (must only be done when you start the STP for the first time)
set etm_version 3
Note: clock <= 6 Mhz
4. Start the Multi Debugger
5. Connect to the target
Note: The ETM clock is now running and the tracing LED is on
6. Reset the target
7. Download the program to the target
an-mb86r01-trace-rev0-01.doc
Chapter 4 Trace startup procedure
- 8 -
© Fujitsu Microelectronics Europe GmbH

Advertisement

Table of Contents
loading

Table of Contents