2.3

NOTES FOR USING

The three phase string power inverter is designed and tested under related safety regulations. It can ensure the personal
safety of the user. But as a electric device, it may cause shock or injury by incorrect operation. Please operate the unit under
below requirements:
1.
Inverter should be installed and maintained by quali ed person under local standard
regulations.
2.
Must disconnect the AC side rst, then disconnect DC side while doing installation and
maintenance, after that, please wait at least 5 mins to avoid getting shocked.
3.
Local temperature of the inverter may exceed 80
to avoid getting injured.
4.
All electrical installation must be in accord with local electrical standards, and after
obtaining the permission of the local power supply department, the professionals can
connect the inverter to the grid.
5.
Please take appropriate anti-static measure.
6.
Please install where children can not touch.
7.
When starting the inverters, rst close the circuit breaker at the grid side, then close the
DC side; when closing the inverters, rst disconnect the circuit breaker at the AC side, then
disconnect the DC side.
8.
Don't insert or remove AC and DC terminals when the inverter is in normal operation.
9.
The DC input voltage of the inverter must not exceed the maximum value of the model.
Hymon Fotowoltaika Sp z o.o.
ul. Dojazd 16A 33-100 Tarnów
while under operating. Do not touch
Wyłączny dystrybutor nowoczesnych systemów
www.hymon.pl

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bpt-v03-15

Table of Contents