7.3
USE OF ZERO EXPORT FUNCTION
When the connection is completed, the following steps should be referenced to use this function:
1. Turn on the AC switch
2. Turn on the DC switch, Waiting inverter LCD lighting up
3. Press Enter button on the LCD panel in the main interface into the menu options, select [parameter setting] to Enter
setup submenu, and then select [running parameters] as shown in gure 7.8, at this time please Input the default
password 1234 through pressing the button [up down, con rm], enter the operation parameter setting interface,
Shown as gure:
Pic 7.8 Parameter setting
4. Operate the button [up down], move setting cursor to limit function and press the button [enter]. At this time you can
turn on or turn o the limit function by choosing [up down] button, please press [enter] button to con rm when setting
done.
5. Move the cursor to [con rm] , press ENTER to save the settings and exit the running parameters page, otherwise
the settings are invalid.
6. If set up successfully, you can return to the menu interface, and display the LCD to [home page] by press
the [up down] button. If it displayed as [utility power], the limiter function settings will be completed.
Shown as picture 7.10.
Hymon Fotowoltaika Sp z o.o.
ul. Dojazd 16A 33-100 Tarnów
Pic 7.7 Connect terminal to inverter
Pic 7.9 Limit switch
Wyłączny dystrybutor nowoczesnych systemów
www.hymon.pl