GENERAL OPERATION

During normal operation, the LCD shows the current status of the inverter, including the current power, total generation,
a bar chart of power operation and inverter ID,etc. Press the Up key and the Down key to see the current DC voltage, DC
current, AC voltage, AC current, inverter radiator temperature, software version number and Wi connection state of the
inverter.
Start
*Note: These parameters will be avaiable after the meter is connected
successfully. Otherwise, it won't show.
8.1
THE INITIAL INTERFACE
From the initial interface, you can check PV power, PV voltage, grid voltage, inverter ID, model and other infomation.
Hymon Fotowoltaika Sp z o.o.
ul. Dojazd 16A 33-100 Tarnów
Setup
*
Pic 8.1 LCD operation ow chart
Wyłączny dystrybutor nowoczesnych systemów
www.hymon.pl

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bpt-v03-15

Table of Contents