Blaupunkt BPT-V03-12 User Manual page 14

Grid-tied pv string inverter
Table of Contents

Advertisement

14
The steps to assemble the DC connectors are listed as follows:
a)Strip o the DC wire about 7mm, disassemble the connector cap nut (see picture 5.3).
b) Crimping metal terminals with crimping pliers as shown in picture 5.4.
c) Insert the contact pin to the top part of the connector and screw up the cap nut
to the top part of the connector. (as shown in picture 5.5).
d) Finally insert the DC connector into the positive and negative input of the inverter,shown as picture 5.6
Hymon Fotowoltaika Sp z o.o.
ul. Dojazd 16A 33-100 Tarnów
7mm
7mm
Pic 5.3 Disassemble the connector cap nut
Pic 5.5 connector with cap nut screwed on
Pic 5.6 DC input connection
Warning:
Sunlight shines on the panel will generate voltage, high voltage in series may
cause danger to life. Therefore, before connecting the DC input line, the solar
panel needs to be blocked by the opaque material and the DC switch should
be 'OFF', otherwise, the high voltage of the inverter may lead to life-
threatening conditions.
Wyłączny dystrybutor nowoczesnych systemów
www.hymon.pl

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bpt-v03-15

Table of Contents