Blaupunkt BPT-V03-12 User Manual page 22

Grid-tied pv string inverter
Table of Contents

Advertisement

22
3) After you nish the installation in process 1 and 2, connect the N line (N) to the N terminal of the limiter and tighten
the line.
4) Connect the control line. There are two numbers 1 and 2 on the interface of SUN limiter, and the same on the water-
proof terminal of the inverter. Twist the waterproof terminal and connect the red line to number 1 and black line
to number 2 shown as the picture. After that connect the terminal to the interface of the SUN limiter. The other side
of the line should be connected to the control terminal.
Pic 7.5 Waterproof terminal
Hymon Fotowoltaika Sp z o.o.
ul. Dojazd 16A 33-100 Tarnów
K
L
Pic 7.3 Clamp Senor
1
2
Load
Pic 7.4 Clamp Senor internal arrow
limiter
+
1
2
Pic 7.6 Connect limiter to inverter
Wyłączny dystrybutor nowoczesnych systemów
www.hymon.pl
-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bpt-v03-15

Table of Contents