Blaupunkt BPT-V03-12 User Manual page 15

Grid-tied pv string inverter
Table of Contents

Advertisement

15
5.2
AC INPUT TERMINAL CONNECTION
Do not close the DC switch after the DC terminal is connected.Connect the AC terminal to the AC side of the inverter, the
AC side is equipped with Three phase AC terminals that can be conveniently connected. Flexible cords are recommended
for easy installation. The speci cations are as shown in Table 5.2.
Model
BPT-V03-12-15
The AC output connector is divided into three parts: matching socket, sleeve and sealingsleeve, as shown in picture 5.7,
the steps are as follows:
Step 1: Remove the cable sealing ring and sleeve in sequence from the AC connector.
Step 2: Use strippers to strip the protective sheath and insulation layer of the AC cable to the right length, as shown in
Picture 5.8.
Hymon Fotowoltaika Sp z o.o.
ul. Dojazd 16A 33-100 Tarnów
Warning:
Prohibit using a single circuit breaker for multiple inverters, prohibit the
connection of load between inverter circuit breakers.
Cable CSA
Cable outer dia
20-25mm
Table 5.2 Cable information
1. Matching socket 2.Sleeve 3.Sealing core 4.Sealing nut
Pic 5.7 AC connector structure
Step 3: Insert the cable (L1, L2, L3, N,PE) into the sealing sleeve.
Pic5.8 Strip AC cable
Warning:
Be careful to distinguish the L1, L2,L3,N and PE of the AC cables.
AWG
Breaker
Max cable length
Outside cable
10
30A/400V
(3+N+PE)20m
40mm
8~15mm
Wyłączny dystrybutor nowoczesnych systemów
www.hymon.pl

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bpt-v03-15

Table of Contents