Identifying the Tie-Down
Points
Figure 41
1. Front tie-down point
Hauling the Machine
•
Use full-width ramps for loading the machine onto
a trailer or truck.
•
Tie the machine down securely.
Towing the Machine
Ensure that the towing vehicle can control the
combined weight of both vehicles; refer to
Specifications (page
17).
Raising the Cutting Units
Whenever possible, raise and latch the cutting units
before towing the machine.
Releasing the Wheel-Motor Brakes
1.
Engage the parking brake and chock the wheels
of the towing vehicle.
g280193
2. Rear tie-down point
2.
Chock the front wheels of the machine.
3.
Raise the platform forward; refer to
Platform (page
4.
Remove the 2 bolts (12 x 40 mm) and 2 washers
(12 mm) stored in the platform support rails
(Figure
42).
1. Bolt (12 x 40 mm) and
washers (12 mm)
5.
Connect a rigid tow bar between the front tow
ring of the machine and the tow vehicle
43).
6.
At the right, front wheel motor brake assembly
remove the hex plug
28
Raising the
35).
Figure 42
2. Platform support rail
Figure 43
(Figure
44).
g292366
(Figure
g328268