Installation procedures
Required tools
•
Torx screwdriver T20
•
Flat screwdriver
•
Open-end wrench 24 mm
•
Nut driver 10 mm
•
Torque wrench with 10 mm hexagon socket
Required parts
Certified AC power supply cord 1.5 mm², 14 AWG, min 300 V
How to connect a UPS unit with the projector electronics?
1.
Make sure the net input cover has been removed. For more info, see
page
42.
2.
Loosen the top nuts on the six UPS configuration pins. Use a 10 mm nut driver.
Image 4–8
3.
Replace the links as illustrated.
Image 4–9
4.
Guide the AC power cord (reference 2) through the cable gland (reference 3). Connect the wires
(references 4 and 5) to the 3-terminal strip as illustrated. Use a torque screwdriver to fasten the screws of
the 3-terminal strip with a torque of 0.75 Nm.
Warning:
46
R5914481 /02 XDX
Always connect the PE wire (reference 4) first, then the other wires.
"Accessing the power connections",