A
Front side projector
B
Bask side projector
Mounting the top frame
1.
Place the top frame on the vertical profiles and vertical fences. Use the rigging screws (R8768925) to
tighten the top frame with rest of the frame.
Caution:
Use high strength threadlocker on the rigging screws thread. Tighten the rigging
screws with a torque of 40 Nm.
Image 3–11
2.
Install the 4 pins on the top of the frame.
Note: These pins cannot be used for stacking XDX projectors.
Note: Provide sufficient high strength threadlocker on the inner thread of the pins.
Image 3–12
3.
Tighten the pins by hand until you feel it is been fully tightened.
Installation preparations
40Nm
R5914481 /02 XDX
31