ICT PRT-ZX8-DIN Installation Manual page 31

Protege din rail 8 input expander
Table of Contents

Advertisement

-
The Dial Attempts option must be programmed. Refer to the section
Operator Reference Manual.
DACT communication channel check-in time is not to exceed 24 hrs.
Trouble Zone Service Test Report
-
The Test Report Time must be programmed. Refer to the section
Operator Reference Manual.
-
The Generate Input Restore on Test Input option must be enabled. Refer to the section
Options
in the Operator Reference Manual.
-
The Test Report Time is Periodic option must be enabled. Refer to the section
the Operator Reference Manual.
-
ArmorIP detects the reception of any invalid packet on the programmed port as a potential system
compromise attempt. Each compromise attempt sends a notification to the receiver, and logs a
Compromise Attempt event under the Live Panel Events.
The event is sent with the following details:
Account Code as defined in the Serial Receiver settings
Event Code 0x163
Group Code as defined in the Serial Receiver settings
Point Code as defined in the Serial Receiver settings
Refer to the section
Application User Manual.
For UL and ULC installations the Central Station Receiving software must have the Contact ID details as
specified, programmed for the Compromise Attempt event.
If a flexible cord is used to connect to line voltage, strain relief must be provided for the cord inside the
enclosure or at the knockout.
The power supply is not intended to be mounted on the exterior of vault, safe, or stockroom.
PRT-ZX8-DIN | Protege DIN Rail 8 Input Expander | Installation Manual
Global Settings | Serial Receiver
Contact ID | Settings
Controllers | Configuration
in the ArmorIP Version 3 Internet Monitoring
in the
in the
Controller |
Controller | Options
in
31

Advertisement

Table of Contents
loading

Table of Contents