El232 Xpcd Operation; Lamp Test; Software Revision; Current Baud Rate Setting - Rice Lake EL232 XPCD Installation Manual

Explosion proof remote display
Table of Contents

Advertisement

4.0

EL232 XPCD Operation

Prior to powering up the EL232 XPCD, double check wiring and setup making sure all wiring is properly
terminated.
Once power is applied, the EL232 XPCD enters the power on clear mode. All status switches are read at this time
and the unit is configured for baud rate, indicator type, and input signal type. The EL232 XPCD display goes
through a power up sequence which can provide valuable information about the operating condition and setup of
the unit.
4.1

Lamp Test

The first display during power on clear is a lamp test.
This test lights all displays, decimal points, and
annunciators. Proper indication is "
five illuminated LEDs above the main display.
Figure 4-1. EL232 XPCD LED Display
4.2

Software Revision

The software revision number which is in the EL232
XPCD is displayed. The display shows
normal revision 2.6 program. This helps identify
specially modified software.
4.3

Current Baud Rate Setting

The EL232 XPCD next shows the current baud rate
setting it had read from switch SW1. The display
bAUd12
shows,
for 1200 baud,
bAUd48
baud,
for 4800 baud, or
baud.
4.4

Input Signal Type

rS232
The display shows
C LOOP
for current loop input. Refer to Section 3.1
for further information on setting the correct input
data type.
8.8.8.8.8.8.
" with
rEV 2.6
bAUd24
for 2400
bAUd96
for 9600
for RS232 data setting or
4.5

Indicator Type

Finally, the EL232 XPCD shows the indicator type
which the EL232 XPCD is receiving. This is
Ind 1
displayed as
number from 1 to 12. Refer to Table 4-1 for a
numerical list of indicator types.
Numeric Display
1
Condec, UMC
2
General Freedom
3
Electroscale 560
4
A N D Instruments
5
Weightronix 110, 120
6
Toledo Hi Speed data format
7
Flex-weigh DWM-4
8
Analogic
for
9
Masstron
10
Fairbanks
11
Streeter Richardson 9000
12
Cardinal 738
16
Generic Format
Table 4-1. Numeric Indicator Type
From the power on clear sequence, the current status
of the display and the current setup information can be
verified. This can be done at any time by pressing the
reset switch (see Figure 3-9 on page 17) on the CPU
or by removing AC power from the unit.
where the 1 can be an indicator
Indicator Type
EL232 XPCD Operation
19

Advertisement

Table of Contents
loading

Table of Contents