CONTENTS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-58
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
• MOUNTING THE UNIT INDOORS
• ELECTRICAL CONNECTIONS
START-UP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-75
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Internal Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Rain Hoods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Blower Rotation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
• UNOCCUPIED MODE
SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75-78
Belt Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .78,79
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can
be hazardous due to system pressure and electrical compo-
nents. Only trained and qualified service personnel should
install, repair, or service air-conditioning equipment.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 536-220
Book 1
4
Tab
10a 12a
Installation, Start-Up and
Service Instructions
Page
. . . . . . . . . . . . . . . . . . . . . . . 1
. . . . . . . . . . . . . . . . . . . . . . . . 1
. . . . . . . . . . . . . . . 47
1
/
TON
2
. . . . . . . . . . . . 47
Printed in U.S.A.
62MB,MC,MD,ME040-950
Energy Recovery
Untrained personnel can perform the basic maintenance
functions of cleaning coils and filters and replacing filters. All
other operations should be performed by trained service
personnel. When working on air-conditioning equipment,
observe precautions in the literature, tags and labels attached to
the unit, and other safety precautions that may apply.
Follow all safety codes. Wear safety glasses and work
gloves. These instructions describe how to install, start up, and
service 62M energy recovery ventilator units.
Electrical shock can cause personal injury and death. Shut
off all power to this equipment during installation. There
may be more than one disconnect switch. Tag all discon-
nect locations to alert others not to restore power until work
is completed.
INTRODUCTION
The 62M energy recovery ventilator (ERV) units recover
energy from building exhaust air and pre-condition ventilation
air. All ERV units are available in either vertical discharge
(through the bottom) or horizontal discharge configuration.
The 62MB and MC vertical discharge units are used when a
stand-alone ERV unit is required.
The 62MD and ME horizontal discharge unit can be used as
a stand-alone unit, or can also be coupled with a Carrier rooftop
unit.
INSTALLATION
Step 1 - Inspection -
with the shipping company if the unit is damaged. Check the
packing list to ensure that the correct items have been received
and notify your Carrier representative of any discrepancy.
Step 2 - Install Roof Curb
STAND-ALONE APPLICATIONS - The ERV unit can be
installed without being coupled with a Carrier rooftop unit. The
ERV units can be installed in one of three stand-alone applica-
tions: down discharge, horizontal discharge, or a combination
of both down discharge and horizontal discharge.
When installing a stand-alone ERV unit refer to Fig. 1-45
and, complete the following:
Locate the Roof Curb - Prior to locating the roof curb con-
sider the structural support required for the rooftop system and,
the duct drop location in relation to the joists. Allow sufficient
space for service, clearance, and locations of vents or other
sources of air.
Form 62M-1SI
Pg 1
Ventilators
Inspect the unit; file a claim
1-06
Replaces: New
Need help?
Do you have a question about the 62MB and is the answer not in the manual?