Download Print this page
Argos Eastleigh Ant Pewter 09H Assembly Instructions

Argos Eastleigh Ant Pewter 09H Assembly Instructions

5ft frame

Advertisement

Quick Links

09H Eastleigh Ant Pewter 5ft Frame
Assembly Instructions
281/1833
- Please keep for future reference
Dimensions
Width - 162cm
Length - 213cm
Height - 112cm
Important
- Please read these instructions fully before starting assembly
If you need help or have damaged or missing parts, call the Customer Helpline:
Argos = 0345 640 0800
Issue 1 - 31/03/15

Advertisement

loading

Summary of Contents for Argos Eastleigh Ant Pewter 09H

  • Page 1 Width - 162cm Length - 213cm Height - 112cm Important - Please read these instructions fully before starting assembly If you need help or have damaged or missing parts, call the Customer Helpline: Argos = 0345 640 0800 Issue 1 - 31/03/15...
  • Page 2: Handy Hints

    Safety and Care Advice Important - Please read these instructions fully before starting assembly • Check you have all the • During assembly do not stand • To reduce the components and tools listed on or put weight on the product, this likelihood of the following pages.
  • Page 3: Components - Parts

    Components - Parts If you have damaged or missing components, call the Customer Helpline: Argos = 0345 640 0800 Please check you have all the parts listed below 1 Headboard 2 Footboard (162 x 112 x 7.5cm) (162 x 94 x 7.5cm)
  • Page 4 Assembly Instructions Step 1 Attaching siderails Position the siderails on the headboard shown. Align the holes and fix using bolts Important: Two persons are required to hold on the frames to assist the assembly. Important: Fasten bolts using allen key but do not fully tighten at this stage.
  • Page 5 Two persons are required to lift the slats. Important: Fully tighten all the bolts at this stage using allen Assembly is complete. If you need help or have damaged or missing parts, call the Customer Helpline: Argos = 0345 640 0800...

This manual is also suitable for:

281/1833