7-17. EC-92 Board
Preparation
Refer to "7-2. Flow Chart".
Procedure
1.
Remove the four screws, and then remove the panel (SXS) subassembly.
2.
Remove the two hooks, and then remove the panel (SXS).
Front panel
Panel (SXS) subassembly
Panel (SXS)
Hook
PSW
3 x 8
Hook
134