Replace Ui - Garland GSL4S Installation, Operation And Maintenance Manual

Electric staging grill
Table of Contents

Advertisement

Replace UI

1. Open front panel
2. Open the panel slowly and disconnect UI cable from
RJ45 Port on SIB board
3. Slide front panel out
4. Remove screws on the UI clamp with one hand pushing
UI on the other side and Remove UI Clamp plate
6. Remove UI
7, Install UI (Ensure Cable ports on the right)
8. Install the screws
9. Slide front panel onto the grill
10. Connect UI cable to RJ45 port on the SIB board.
11. Close front panel and install screws.
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsl6sGsl6d

Table of Contents