0Rc, 520R2C And 520Rec Installation; Opening The Pumphead Guard; 520Rc And 520R2C Tube Loading - Watson Marlow Pumps 521CC Manual

Table of Contents

Advertisement

Watson-Marlow Bredel E-Manuals
file://M:\staging\pdfs-global\m-521-cc-gb-03.htm

13 520RC, 520R2C and 520REC installation

13.1 Opening the pumphead guard

Isolate the pump from the mains power supply.
Unlock the pumphead guard by turning the guard fastener ¼ turn anticlockwise with a
flat-head screwdriver.
Open the guard to its full extent to create maximum clearance for the tube ports.
Ensure that the rollers rotate freely and that the tube clamps are clean.

13.2 520RC and 520R2C tube loading

520RC continuous tubing pumpheads are factory-set to accept Watson-Marlow 1.6mm-wall
tubing. 520R2C continuous tubing pumpheads for close-coupled drives are factory set to
accept Watson-Marlow 2.4mm-wall tubing. Pumping performance may be adversely
affected if Watson-Marlow tubing is not used.
Mark a 225mm length onto the section of the tubing which is to be located into the
pumphead.
Open the lower spring-loaded tube clamp and locate tubing, with the first 225mm length
mark aligned to the inside face of the spring-loaded part of the tube clamp. Release the
clamp.
Disengage the rotor clutch by fully depressing the yellow clutch button on the side of the
rotor hub and turning the hub a few degrees while the clutch button is still depressed.
The rotor can now rotate independently of the gearbox and motor for one full revolution.
If the clutch re-engages before tube fitting is complete, depress the clutch button again
and turn the rotor a few degrees.
Page 23 of 47
14/12/2009

Advertisement

Table of Contents
loading

Table of Contents