Download Print this page

Insignia Outdoor Series Installation Manual page 14

Advertisement

www.insigniashowers.com
Last Modified: 16/02/2022
Step 10 — Electric box
The electrical box (below) should be housed in the sauna,
underneath the back bench on the floor. Install electrical
connections. Partner up all corresponding wires which are
denoted by matching stickers from the box to the back/
right panels.
Note: It is recommended to make this connection now
with full access.
14

Advertisement

loading

This manual is also suitable for:

Mxos1700