Accessories -
36
Extra Heating Zone Accessory Pack
4. Install the remaining 2 pipe stubs into the blanked
off compression T piece connectors located on the
primary flow pipework, the top one should be for
Zone 1 and the bottom one should be used for Zone 2.
There are compression fittings provided for connection
of the heating flow pipework for zone 1 and 2
respectively, again it is possible to use 45 degree
elbows if there is a requirement to tilt the pipe stubs
towards the cylinder body.
Electrical Connections
1. Connect the colour coded (yellow) plug to the corresponding
connector found within the FTC4 casing. Run the cables through
one of the entry grommets at the base of the case and cable tie
any loose cable to existing cables.
2. The additional sensors should be wired into the following terminals
on the main FTC4 circuit board: