Battery - Can-Am Spyder RT Series Instructions Manual

Table of Contents

Advertisement

PARTS TO BE INSTALLED
SPECIFIED TORQUE
Adjuster nut
rbl2014-004-019_a
LEFT SIDE SHOWN (RIGHT SIDE SIMILAR)
1. Low beam adjuster (to install at PDI)
2. High beam adjuster (installed at factory)
40. From inside the LH air duct trim panel (low
beam headlight trim panel on CE models),
carefully insert the tab on the inside of the
panel and install the metal clip that was previ-
ously removed.
rbl2014-004-041_a
LH AIR DUCT TRIM PANEL (LOW BEAM HEADLIGHT TRIM
PANEL ON CE MODELS)
1. Trim panel
2. Metal retaining clip to install from inside panel
41. Install 3 plastic rivets that were previously re-
moved on the trim panel of the LH air duct (low
beam headlight trim panel CE models).
22 / 52
2.5 N•m ± .5 N•m
(22 lbf•in ± 4 lbf•in)
2014-1
rbl2014-004-042_a
LOW BEAM HEADLIGHT TRIM PANEL ILLUSTRATED (CE
MODEL)
1. Plastic rivets to remove (3)
42. Install M6 x 20 Torx screws and plastic wash-
ers to secure trim panels of the LH and RH
air ducts (low beam headlight trim panels CE
models).
rbl2014-004-022_a
LEFT SIDE SHOWN, RIGHT SIDE SIMILAR
1. Trim panel
2. M6 x 20 Torx screw and washer
SPECIFIED TORQUE
Side panel retaining
screws

Battery

Battery Activation
The battery is fully activated and only requires an
initial top up charge to ensure it is fully charged
prior to vehicle delivery.
If you do not have a fully charged new bat-
NOTE:
tery at hand, the battery can be removed from the
vehicle, fully charged as per manufacturers spec-
ification and reinstalled in the vehicle later.
3.5 N•m ± .5 N•m
(31 lbf•in ± 4 lbf•in)
PREDELIVERY

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spyder rt sm6Spyder rt se6Spyder rt limited se6Spyder rt-s sm6Spyder rt-s se6

Table of Contents