F
Verification
Once completed the entire installation procedure, check the following points:
Complete the Commissioning checklist.
Check that all the MCB, RCD, Main Circuit Breaker and Disconnectors are powered
on.
Check that all safety labels are correctly placed.
Close the Charge Point's doors. The Charge Point has a security switch (anti-
tamper protection) installed that will avoid any charging session if the doors are
opened.
Check that all beacons are illuminated in green.
Verify that each EV connector is in good condition.
Make sure the ventilation air flow is correct and there is not any obstruction at the
air inlets and outlets.
Check for abnormal noise while charging a vehicle.
G
How to use and configure
In order to use and configure the Charging Station there is an User Manual. To get it,
download it from the Expert Area or send a mail to support@circontrol.com.
Note: Ask Circontrol PS-Support Department in order to register in the Circontrol
Expert Area.
29

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Raption 150 Compact and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents