6.4 Installation -V:

Vertical installation on support.
Check points before operation:
- Fixation of the base-plate to the floor, (
- Flanges straight horizontal and vertical
- Maximum flange forces and moments, see chapter 6.6.
- Adjust start and stop levels in such a way that the pump
does not make more than 20 starts per hour.
6.5 Installation –K:
V-belt driven with motor and frame.
Checkpoints before operation:
- Fixation of the base-plate to the floor, (pos. 8).
- Flanges straight horizontal and vertical
- Maximum flange forces and moments, see chapter 6.6.
- Adjust start and stop levels in such a way that the pump does not make more than 20 starts
per hour.
- Correct tension of the V-belts. see .6.4.1
Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES
Subject to modifications
The main parts are:
1.
pump unit;
2.
bearing unit;
3.
flexible coupling;
4.
motor support;
5.
electric motor;
6.
pump support;
7.
fixing bolts;
8.
delivery pipe;
9.
suction pipe;
pos. 7).
The main parts are:
1.
pump unit;
2.
bearing unit;
3.
pulleys;
4.
tensioner;
5.
electric motor;
6.
frame;
7.
protection plate;
8.
fixing bolts ;
9.
delivery pipe;
10.
suction pipe;