APPENDIX 1; Example of a direct-on-line connection diagram: ........ 23 APPENDIX 2; Example of a star-delta connection diagram: ........24 APPENDIX 3; EC- Declaration of Conformity: ............. 25 Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 2 / 28 Subject to modifications...
FOREWORD: Congratulations on choosing a LANDUSTRIE BTP pump, which will undoubtedly serve you both reliably and economically for a long time, providing you follow the Maintenance Instructions given in this manual. Proper use and maintenance will prolong the operational life of your pump.
Inportant for correct use and safety gloves Warning Environment Recommended rotating parts Advice On the pump: Warning Warning EC-conformity symbol Electrical hazard rotating parts Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 4 / 28 Subject to modifications...
Bearing housing Pump shaft Seal pump side Seal motor side Bearings 10 Oil tank 11 Plug with gauge rod 12 Drain plug 13 Connection pressure gauge Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 5 / 28 Subject to modifications...
If thermostats are supplied make sure that they are correctly connected. For examples of electrical diagrams and pump cable coding, see appendix 1 and 2. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 6 / 28 Subject to modifications...
Following this procedure sticking mechanical seal surfaces will be loosened smoothly. 4.7 Installation: Check if all components for your installation are delivered. See also chapter 6. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 7 / 28 Subject to modifications...
When the pump is controlled by level regulation, the on and off levels should be adjusted in such a way that the pump does not make more than 20 starts per hour. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 8 / 28...
- 2 angular deflection (A) max. 1 To improve the alignment, use skims underneath the motor and pump fixing bolts. Re-install the protection hood in the original position. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 9 / 28 Subject to modifications...
The rails can be adjusted with the aid of pos. 13 can be adjusted in all directions. Adjust the rail construction and the coupled rails on the rail construction of the pump. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 10 / 28...
- Adjust start and stop levels in such a way that the pump does not make more than 20 starts per hour. - Correct tension of the V-belts. see .6.4.1 Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 11 / 28 Subject to modifications...
- Check the correct tension of the V-belts! - Replace the protection plate. The pump is now ready to use. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 12 / 28 Subject to modifications...
The forces and moments may not exceed the values stated in the table below: Pump [Nm] type [Nm] [Nm] BTP62-40 1400 1400 3000 1200 1200 1300 BTP62-50 1400 1400 3000 1200 1200 1300 Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 13 / 28 Subject to modifications...
To drain the oil, remove one of the oil pipes, or use the drain pipe. We advise to flush the system with fresh oil, before filling it up. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 14 / 28...
To correct the alignment, use skims underneath the motor and pump fixing bolts. Re-install the spacer, elastomers, rings and protecting hood. The pump is now ready to use. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 15 / 28 Subject to modifications...
During the first inspection after commissioning of the installation, or after replacement of the Flexible coupling, the tightening torques of the bolt connections must be checked. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 16 / 28 Subject to modifications...
- If the shells do not come loose manually, use a plastic hammer if necessary. - Remove the compound coupling from the shafts. (Note: consists of several parts) Flexible coupling “spider” Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 17 / 28 Subject to modifications...
- When metal parts (claws, shells or the spacer) are damaged, the coupling must be replaced in its entirety. Wear indication "Spider" Coupling Dimensions Maximum Dimensions Maximum clearance X- clearance X- max. (mm) max. (mm) Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 18 / 28 Subject to modifications...
- Fit the new rubber element (3) and fit the cover caps (2). - After this, replace the protective caps of the lantern housing. The pump is now ready for operation again at this point. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 19 / 28 Subject to modifications...
6. Unscrew the lower nuts from pos. 3 so that the wheels are just under tension. Then tighten the top nuts. 7. Tighten the lower nuts from pos. 6 Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 20 / 28 Subject to modifications...
The needed flushing pressure must be at least 2/3 of the pump pressure. Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 21 / 28 Subject to modifications...
* Control panel Motor failure Check motor * Continuity and isolation * = If Applicable If the pump stil does not start, consult Technical expert: Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 22 / 28 Subject to modifications...
APPENDIX 1; Example of a direct-on-line connection diagram: Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 23 / 28 Subject to modifications...
APPENDIX 2; Example of a star-delta connection diagram: Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES 24 / 28 Subject to modifications...
Need help?
Do you have a question about the LANDY BTP62-40 and is the answer not in the manual?
Questions and answers