6.3. Installation R-

5
12
13
6
11
7
When installing, it must be ensured that:
- The base plate (pos.11) is anchored to the foundation (pos. 7).
- The top surface of the discharge flange is level, (pos.9).
- The base plate is filled with non-shrinking concrete
- The forces on the discharge and suction flanges do not exceed the values according to the table
in section 6.6.
- The rails are adjusted accordingly with pos. 13 that it is level and that the pump can be smoothly
driven in and out of the pump housing. See par. 7.6.5
- The carriage anchoring pos.12 is adjusted in such a way that the wheels are not under tension
when the pump is not being serviced.
- The start and stop levels of the level control are set so that the pump does not make more than
20 starts per hour.
- If the base plate is connected to a subsequent base plate with rail construction, orientation must
be correct. The rails are properly oriented when the pin on the end of the rails falls into the hole
of the successive rails. The rails are symmetrical and can optionally be turned around on the
base plate. The rails can be adjusted with the aid of pos. 13 can be adjusted in all directions.
Adjust the rail construction and the coupled rails on the rail construction of the pump.
Landustrie version 06-14 | Operation & Maintenance manual BTP-SERIES
Subject to modifications
1
4
3
2
The main parts are:
9
1. Pump housing unit
2. Bearing housing (RF only)
3. Coupling
10
4. Lantern house
5. Motor
6. Slide construction
7. Fixing bolts
8
8. Pump housing foot
9. Discharge flange
10. Suction flange
11. Base plate with rail
construction
12. Sled Anchoring
13.
Rail adjustment
10 / 28