ABB FXE4000 Commissioning Instructions page 52

Electromagnetic flowmeter
Hide thumbs Also See for FXE4000:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 35
Installation
Preparation
Complete the installation before beginning sealing activities in order avoids moisture
penetration. Before starting, check all the connections for correct fitting and stability.
Do not overfill the terminal box. Keep the potting compound away from the O-ring and the
seal/groove (see below).
Prevent the potting compound from penetrating a conduit if an NPT ½" thread is used.
Procedure
1. Remove the outer wrapper by cutting with scissors where indicated.
2. Remove the rubber end caps from the centre clip. Remove the clip.
3. Knead both components thoroughly until a uniformly blend is reached.
4. Cut open the bag at a corner.
5. Carefully fill the terminal box with potting compound until the connecting cable is covered.
6. Wait before closing the cover in order to allow the compound to dry, and to release any
possible gas.
7. Ensure that the packaging material and the drying bag are disposed of in an environmentally
sound manner.
Fig. 21
1 Packaging bag
2 Drying bag
3 Clamp
18 - EN
1
FXE4000 (COPA-XE/MAG-XE)
5
4
3
2
4 Sealing compound
5 Filling height
G00167
D184B133U02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fxe4000 copa-xeFxe4000 mag-xe

Table of Contents