Limit Switch Setup - Viking G-5S Installation Instructions Manual

Table of Contents

Advertisement

Limit Switch Setup

STEP 1
Remove the Lead Screw Cover:
a. Remove the cover mounting screw.
b. Slide the cover off.
!
TIP:
Leave the cover off until after
the installation of the ECU Box and
electrical installation. Verify that the
operator opens and closes to the
desired limit positions under power.
Make any adjustments as necessary
STEP 2
Position the Limit Switches:
a. Loosen the setscrews on the Limit
Switch Holders and slide the Limit
Switches to the desired positions.
b. Move the gate manually and ensure the
Limit Switches are actuated (click) at
the desired open and closed positions.
c. Resecure the Limit Switch Holders
when the proper position has been
determined. DO NOT OVERTIGHTEN
STEP 3
Positive Stop Collar:
a. After the limit positions have been
verified, partially open the gate and
position the Positive Stop Collar as
shown, with a 1/16" gab between the
Collar and the Limit Switch Holder.
b. Tighten the Collar EVENLY to secure.
c. Run the gate two complete cycles and
check that the Lead Screw Carrier
makes firm contact to the Positive Stop
Collar.
STEP 4
Reinstalling the Lead Screw Cover:
a. Ensure that the End Cap is properly
positioned over the tip of the Lead
Screw as shown.
www.PerformanceGateOpeners.com | (800) 878-7829 | Sales@PerformanceGateOpeners.com
GATE OPERATOR INSTALLATION
1 7

Advertisement

Table of Contents
loading

Table of Contents