Installation; Mechanical Connection; Lifting Eye / Suspension Bolt; Load Hook And Chains - probst TSZ-UNI Operating Instructions Manual

Concrete step handles
Table of Contents

Advertisement

Installation

4
Installation
4.1

Mechanical connection

Use only original accessories, in case of doubt consult the manufacturer.
Take care that the carrying capacity / working load limit (WLL) of the lifting device/carrier is not exceeded,
through the load of the device, the attaching devices (turning device, fork sleeves etc.) and the additional
load of the gripping goods!
Gripping devices always have to be gimballed, so they can swing freely in any position.
In no case it is allowed to mount gripping devices with lifting devices/carriers in a rigid way!
Break of the suspension may occur within short time. Death, severe injuries and material damage can
result!
4.1.1

Lifting eye / Suspension bolt

The device is equipped with a lifting eye / suspension bolt and can be mounted on various carrier /
lifting devices.
Take care that the lifting eye / suspension bolt is safely joined with the lifting tackle (e.g. crane hook,
belt) and cannot slide down.
4.1.2

Load hook and chains

Fit suspension ring in the load hook of the lifting device/carrier.
Ensure that the single chains strands are not twisted or knotted.
Attaching the device to the lifting device/carrier, take care that all local safety regulation is observed.
4.1.3

Rotators (optional)

When using rotators, a free-wheel throttle valve must be installed.
In order to prevent a sudden speedup and stopping the rotational movements, as this may damage the
device within a short time.
5310.0338
V6
12 / 26
GB

Advertisement

Table of Contents
loading

Table of Contents