Installation - Endress+Hauser Fieldbus Levelflex M FMP41C Operating Instructions Manual

Guided level-radar foundation fieldbus
Hide thumbs Also See for Fieldbus Levelflex M FMP41C:
Table of Contents

Advertisement

Levelflex M FMP41C with FOUNDATION Fieldbus
"
Endress + Hauser
3.3

Installation

3.3.1
Mounting kit
In addition to the tool needed for flange mounting, you will require the following tool:
• 4 mm Allen wrench for turning the housing.
3.3.2
Mounting probes
Caution!
If there is a risk of electrostatic discharge from the product, then both processconnection and rope
must be earthed before the probe is lowered into the silo.
Insert probe
• Uncoil rope and lower it slowly and carefully
into the silo.
• Do not kink the rope
• Avoid any backlash, since this mightdamage
the probe or the silo fittings.
!
Note!
– Flanges: bolt the flange in positionbefore
inserting the cable into the silo.
– Be sure to use unpainted metal bolts
toensure good electrical contact
betweenprobe flange and process flange.
Installation
Uncoil rope and lower
probe slowly and
carefully into the silo
L00-FMP4xxxx-17-00-00-en-056
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Fieldbus Levelflex M FMP41C and is the answer not in the manual?

Questions and answers

Table of Contents