Start-Up; Information Regarding The Start-Up; Switching The Heat Pump On For The Very Fi Rst Time; Operation - iDM AERO ILM 2-7 Installation Instructions Manual

Modulation air-water-heat pumps for indoor installation
Table of Contents

Advertisement

8.1. Information regarding the start-up

Before starting up the IDM heat pump ensure water
tightness on the heating side, rinse the heat pump
thoroughly, fi ll and ventilate the heat pump carefully.
Start-up requirements
- The heating and a possibly existing storage tank
have to be fi lled and ventilated.
- At the start-up the complete heating buff er has to be
heated up to min. 20 °C. This can be performed e.g.
with the electric heating rod.
- The electrical installation must be completed and
fused properly.
- The heat pump may only be switched on if it is
properly fi lled on the coolant side as well as on the
heating side and if the electrical connections are in
place.
- At the start-up the maximum temperature limit has
to be set. The switch-off point at 60 °C must be
checked and, if applicable, the shut-down tempera-
ture then adapted.
- The heat pump is furnished with a delay time of 10
minutes, so that the compressor only starts after
this start-up delay.
- If the heat pump is to be drained on the heating
side in a frost-proof way, the connection hose has
to be loosened at the heat pump return (plate heat
exchanger).
8.1.1. Switching the heat pump on for the very fi rst
time.
After pressing the main switch on the heat pump, the
start-up assistant is started after selecting the desired
language.

8.1.2. Operation

The AERO heat pump is independently switched on
and off via the fully automatic navigator regulation.
See the separate operation and start-up instructions
for information on Operation and Start-up.
(C) IDM Energiesysteme GmbH
An annual inspection and maintenance of the system
by customer service is recommended, in particular
with regard to protecting the guarantee claims.
In accordance with Regulation (EU)
No. 517/2014 of 01/01/2015 on certain
fl uorinated greenhouse gases and in
accordance with Regulation (EG) No.
1516/2007, the operator of a heat pump
system is obligated to carry out regular
leak tests by a certifi ed professional. The
interval may vary depending upon the
CO equivalent capacity. The inspection
intervals are indicated in the Check- and
servicebook.

8.2. Errors

The AERO heat pump is furnished with a multitude of
safety switching device so that in the event of distur-
bances no damage will take place to the equipment.
If contrary to expectations the heat pump fails to func-
tion, please check the error message shown on the
display on the navigator regulation.
See the operating instructions of the navigator regu-
lation!
If an error occurs several times in se-
quence, please contact your iDM cus-
tomer service!
Customer service phone No.: __________________
Installation instructions AERO ILM

8. Start-up

61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aero ilm 4-13Aero ilm hgl

Table of Contents