Water Connection; 8�1 Inlet Connection; 8�2 Tank Water Quality Management; 8�3 Water Drain Connection - Rinnai brivis Contour Series Installation Manual

Table of Contents

Advertisement

8. WATER CONNECTION

8.1 INLET CONNECTION
The water inlet connection point is under the cooler base on the left hand side, at the high side of the roof� The
connection is via a 1/2" BSP female fitting supplied on a flexible hose.
8.2 TANK WATER QUALITY MANAGEMENT.
The Brivis Advance, Brivis Promina and Brivis Contour's Series electronic water level sensor automatically maintains
the correct water level within the tank� The Brivis Advance and Brivis Promina Series models is programmed to
periodically flush the tank and refill it with clean water, depending on the operating conditions, and automatically 
maintain  the  water  quality  within  the  tank.  The  Brivis  Contour  Series  is  fitted  with  an  AquaSave  module  that 
maintains water purity during the cooler's operation and therefore does not flush as often.
8.3 WATER DRAIN CONNECTION
Brivis Advance, Brivis Promina and Brivis Contour Series models
have a drainage connection point at the underside of the base, on
the low side of the roof�
Local jurisdictions may require a discharge pipe to be fitted to the 
drain outlet of evaporative coolers� Where the roof or catchment
area is used for the collection of potable water, the manufacturer
recommends that the outlet of the discharge pipe is separately
drained to avoid any contamination of water intended for potable
use�
If a discharge pipe is required, the manufacturer recommends that
the outlet is located such that water is adequately dispersed and
does not cause nuisance or damage, for example  gutter overflow 
and accelerated corrosion�
Check requirements with your local jurisdiction�
There are two recommended options when connecting
drainage to the unit:
Option  one  is  for  a  small  diameter  pipe  to  be  fitted  over  the 
ø19�8mm spigot detailed in Figure 1�
Option two is for a larger diameter pipe and prior to connection,
the snorkel outlet MUST BE modified by cutting and de-burring 
at the "CUT LINE" shown in Figure 1. Once complete, slide on 
the large diameter pipe, drill a pilot hole Ø3mm and secure with
a 8gx3/8 stainless steel screw as shown in Figure 2�
If installing a drain to the discharge of the evaporative cooler:
Ensure that all field supplied drainage pipe is rigid (not flexible) 
and UV stabilised�
Ensure any drain has a continuous fall, the joints and fittings are 
adequately sealed, and that all penetrations in and out of the
roof cavity are sealed against water entry into the building�
The drain pipe MUST also be properly supported along its entire
run, and MUST NOT place strain on the Cooler's outlet fitting 
or base�
Brivis
18
Evap AC IM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents