Receiving Your Unit - Prochem EVEREST LP Operating Instructions Manual

Table of Contents

Advertisement

RECEIVING YOUR UNIT

ACCEPTANCE OF SHIPMENT
Every part of your cleaning unit was carefully
checked, tested, and inspected before it left our
manufacturing plant. Upon receiving the unit, make
the following acceptance check:
1. The unit should not show any outward signs of
damage. If damaged, notify the delivering carrier
immediately.
2. Check your equipment and packing list. The
cleaning unit should arrive equipped with the
following items (unless otherwise specified).
NOTE: Your distributor from whom you
purchased this mobile cleaning unit is
responsible for the correct installation of this
machine. The dealer is also responsible for initial
training of your operators and maintenance
personnel in the proper operation and
maintenance of this unit.
4
EQUIPMENT LIST:
1. Console.
2. Waste tank
3. Hose clamps for vacuum hoses.
4. 150 ft. of 2" vacuum hose.
5. 2 vacuum hose connectors.
6. 150 ft. of 1/4" high pressure hose with quick
connects.
7. 50 ft. water supply hose with quick connect.
8. Installation bolting kit.
9. Installation mounting plates.
10. Operation and service manual for engine, water
pump, and vacuum pump manuals.
EVEREST 980086 12/31/02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Everest hp

Table of Contents