Quick Start Guide
Installation, Operation, Commissioning and Maintenance
Flatpack2 PS System, SP2
Smartpack2-based, DC Power Supply System
Integrated 4U Distribution, Cabinetized and Outdoor Applications
Introduction
The Smartpack2-based Product Range
o
Brief Description, Smartpack2-based System
o
Installation
Installing Rectifiers & Opening Smartpack2 Master
o
Installation steps; mechanical, electrical
o
Location of Components, GA Drawing
o
Connections, Factory Settings, etc.
o
Commissioning
Pre-start check
(8 )
o
Commissioning steps, Startup
o
Operation
Front keys and display, Controller Access via PC
o
Software Menus – Smartpack2 Master Controller
o
Appendix
Communication
CAN Bus Termination and Addressing
o
AC Mains
External AC Fuses, Recommended Rating
o
Identifying Power Shelves, 4AC, 2AC or 4AC-3kW
o
I.
Individual AC Mains Terminals ~ NOT Reconfigurable
o
II. AC Mains Terminal Block ~ Reconfigurable
o
III. AC Terminal Block with SPDs ~ NOT Reconfigurable
o
About AC, DC Earthing Systems
o
Mains Phases vs. Rectifier ID – Phase Balancing & Monitoring
o
Battery Monitoring
Battery Monitor's 48V Symmetry Connections (20-21)
o
Internal Connections
Standard Alarm Relays & Digital Inputs – Connections
o
LVD Latching Contactors – Connections
o
Replacing Smartpack2 Basic Controller, inside- or top cover-mounted...(23)
o
CAN Bus Nodes
Battery Monitor CAN Node
o
Load Monitor CAN Node
o
I/O Monitor and I/O Monitor2 CAN Nodes
o
Check Lists
Installation Check List
o
Circuit Distribution List
o
Commissioning Procedure
o
Maintenance Procedure
o
(2 )
(2 )
( 3)
(4-5)
(6 )
( 7)
(8-9)
(10 )
( 11)
(12 )
( 13)
(14 )
(15 )
( 17)
( 22)
(24 )
( 25)
(26 )
356825.103
(14 )
(16 )
(18-19)
( 22)
pullout forms
Need help?
Do you have a question about the Flatpack2 and is the answer not in the manual?
Questions and answers