Prior to Installing the SPX-CABFIN
1
Before pouring concrete, be sure that all four 1/2-13 anchor bolts are threaded all the way down in the
template anchor nuts.
2
Ensure that the wire mesh is set approximately 2 inches (51 mm) off the bottom of the form.
To keep concrete from entering during the pour, cover the duct openings.
3
Pour the concrete. Puddle the concrete along all edges of the form.
4
Finish the concrete so that it is flush with, to 1/4 inch (6 mm) below, the top of the template mounting plates.
The pad should be level to within 1/2 inch (13 mm) over the entire length and width.
The pad must cure for a minimum of seven days before supporting any significant load, or before the cabinet
is installed. After the second day, the forms may be removed.
10
November 9, 2001
LTPS-UM-8007-01, Issue 1
SPX-CABFIN01, SPX-CABFIN04

Advertisement

Table of Contents
loading

This manual is also suitable for:

Soneplex spx-cabfin01

Table of Contents