Control Panel Functions - Meridian 405 SLD SEED EXPRESS Operator's Manual

Bulk seed tender
Table of Contents

Advertisement

Operator's Manual: 405 SLD Seed Express
The MEGA REMOTE system is a state-of-the-art
microprocessor based Radio Frequency (RF)
control system. It provides the operator the
ability to operate the seed tender from the
remote control handset or the control panel.
Note:
The controls on this panel are intended to be
used only as a backup resource. All of the
functions of the seed tender can more easily
be controlled using the handset.
a. LCD Display:
Turning key switch (b) to the ON position will
turn the LCD backlight ON. It will stay on
until the key is turned to the OFF position.
b. On/Off Key Switch:
This key switch controls the power to the
electrical system. Turn the key clockwise
to turn the electrical system ON. The key
must be in the ON position for the engine to
start or the handset to function. Turn the key
counterclockwise to turn OFF the electrical
system.
c. Starting the Engine:
Press and hold this button until the engine
starts. Also set the choke lever on the engine
when starting the engine. Turn the key
counterclockwise to turn OFF the engine.
d. Conveyor Up and Down:
This switch raises and lowers the conveyor.
Press the switch UP to raise the conveyor.
Press the switch DOWN to lower the
conveyor.
e. Conveyor Swing Front and Swing Rear:
This switch positions the conveyor to the
right or left. Press the switch to the LEFT to
position the conveyor towards the front of
the unit. Press the switch to the RIGHT to
position the conveyor towards the rear of the
unit.
Revised 08.2021
Bulk Seed Tender

3.3 CONTROL PANEL FUNCTIONS

®
a
b
e
d
f
Fig 17 - Electrical control panel inside box
f.
Conveyor Start and Stop:
This toggle switch starts and stops the
conveyor belt. Press the toggle switch UP to
start the conveyor. Press the toggle switch
DOWN to stop the conveyor.
g. Slide Gate 1:
This switch opens and closes the slide gate
at the bottom of the compartment 1. Press
and hold the switch UP to open the slide
gate; press and hold the switch DOWN to
close the slide gate. The opening can be
varied to provide the desired flow rate of
seed onto the conveyor belt.
h. Slide Gate 2:
This switch opens and closes the slide gate
at the bottom of compartment 2. Press and
hold the switch UP to open the slide gate;
press and hold the switch DOWN to close
the slide gate. The opening can be varied to
provide the desired flow rate of seed onto
the conveyor belt.
c
j
i
k
l
g
h
3-7
®

Advertisement

Table of Contents
loading

Table of Contents