Meridian 405 SLD SEED EXPRESS Operator's Manual page 26

Bulk seed tender
Table of Contents

Advertisement

®
Operator's Manual: 405 SLD Seed Express
Bulk Seed Tender
®
Break-Away System:
A Break-Away Switch is installed on all trailers.
The control box contains LEDs to show the
condition of enclosed battery. There is a Test
button to check the battery level.
IMPORTANT:
Test the Break-Away Switch periodically.
Removing the pin, then pull the trailer
to feel if the brakes have engaged.
The cable attached to the Break-Away Switch
pin, must go around the ball before coupling the
Fig 15 - Break-Away system control box
trailer to the tow vehicle.
During transportation, if the trailer should detach
from the transport vehicle, the pin will be pulled
out engaging the trailer's brakes.
TRANSPORT HAZARD
Always secure the safety chains
to the tow vehicle, in addition
Fig 16 - Break-Away cable on hitch tongue
to the Break-Away Switch.
3-6
Revised 08.2021

Advertisement

Table of Contents
loading

Table of Contents