Download Print this page

Wren Kitchens 2070 Assembly Manual

Tower unit, diagonal corner office
Hide thumbs Also See for 2070:

Advertisement

Quick Links

TOWER UNIT
2070 & 2250 Diagonal Corner Office Assembly Guide
2070 - 2250 x 1302
1 Door
70/30 Door
50/50 Door
For Internal Use: FI.WR.INS.114_WKIN00175_Diagonal_Corner_Office_Rev2

Advertisement

loading
Need help?

Need help?

Do you have a question about the 2070 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Wren Kitchens 2070

  • Page 1 TOWER UNIT 2070 & 2250 Diagonal Corner Office Assembly Guide 2070 - 2250 x 1302 1 Door 70/30 Door 50/50 Door For Internal Use: FI.WR.INS.114_WKIN00175_Diagonal_Corner_Office_Rev2...
  • Page 2 TOWER UNIT 2070 & 2250 Diagonal Corner Office Assembly Guide BEFORE YOU START INSTALLATION SHOULD BE PERFORMED BY A COMPETENT PERSON ONLY. THIS PRODUCT COULD BE DANGEROUS IF INCORRECTLY INSTALLED Panel eA x1 Panel eB x1 Panel eC x1 Panel eD x1...
  • Page 3 Step 1. Step 2. Seat 4 cam dowels (W) into holes Seat 2 wooden dowels (F) into in end panel (eC) as shown. holes in panel (sE) as shown. Step 3. Attach panel (sE) to end panel (eC), using cam dowels (W) (in blue) and wooden dowels (F) (in orange) in positions as shown.
  • Page 4 TOWER UNIT 2070 & 2250 Diagonal Corner Office Assembly Guide Do not use power tools with cam dowel (W) or cam lock (H) Step 7. Insert 2 cam locks (H) into holes in back panel (bM) as shown. Do NOT tighten until step 16.
  • Page 5 Step 12. Seat 2 wooden dowels (F) into holes in panel (sE) and 3 wooden dowels (F) into holes in back panel (bN) as shown. Step 13. Seat 4 cam dowels (W) into holes in end panel (eD) as shown. Do not use power tools with cam dowel (W) or cam lock (H) Front view...
  • Page 6 TOWER UNIT 2070 & 2250 Diagonal Corner Office Assembly Guide Step 18. Seat 11 cam dowels (W) into holes in end panel (eA) as shown. Step 19. Seat 2 wooden dowels (F) per panel into holes in panel (sF) and (sH) as shown.
  • Page 7 Step 22. Seat 8 wooden dowels (F) per panel into holes in panels (sF), (sG) and (sH) and 4 wooden dowels (F) into holes in end panel (eA) as shown. Back right view Back right view Step 23. Attach back panel (bK) to end panel (eA) and panels (sF), (sG), (sH), using cam dowels (W) (in blue) and wooden dowels (F) (in orange) in positions as shown.
  • Page 8 TOWER UNIT 2070 & 2250 Diagonal Corner Office Assembly Guide Step 25. Secure back panel (bK) to panels (sF), (sG) and (sH), using 12 x 45mm screws (P) as shown. Step 26. Attach back panel (bL) to panels (sF), (sG), (sH), using wooden dowels (F) (in orange) in positions as shown.
  • Page 9 Step 29. Seat 2 wooden dowels (F) per panel into holes in panel (sF) and (sH) as shown. Seat 1 wooden dowel (F) per panel into hole in panels (sG) as shown. Seat 4 wooden dowels (F) into holes in back panel (bL) as shown.
  • Page 10 TOWER UNIT 2070 & 2250 Diagonal Corner Office Assembly Guide Step 34. Make sure bottom unit is attached to walls. Place top unit on bottom unit, ensure end panel (eA) is flush with end panel (eC) and end panel (eB) is flush with end panel (eD).
  • Page 11 Step 37. Attach hinge plates to the inside face of end panels on the left side (eA) and (eC) and end panels on the right side (eB) and (eD) to suit as shown. Hinge plate Hinge side to be mounted in accordance to customer specific kitchen plan.
  • Page 12 TOWER UNIT 2070 & 2250 Diagonal Corner Office Assembly Guide Step 37. Attach hinge plates to the inside face of end panels on the left side (eA) and (eC) and onto end panels on the right side (eB) and (eD) to suit as shown.
  • Page 13 Step 37. Attach hinge plates to the inside face of end panels on the left side (eA) and (eC) and onto end panels on the right side (eB) and (eD) to suit as shown. Hinge plate Hinge side to be mounted in accordance to customer specific kitchen plan.
  • Page 14 TOWER UNIT 2070 & 2250 Diagonal Corner Office Assembly Guide Door Frontal Fixing (Where Applicable) Infinity + Doors Supplied in accordance to 50/50 & 70/30 1DOOR OPTION customer specific kitchen plan OPTIONS Fixing plate Step 1. Insert hinge into hinge holes provided, in accordance with customers plan.
  • Page 15 For Internal Use: FI.WR.INS.114_WKIN00175_Diagonal_Corner_Office_Rev2 Page 14...

This manual is also suitable for:

2250