Creality CR-10 Smart User Manual page 9

Hide thumbs Also See for CR-10 Smart:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Install the Rack
The material rack can be installed in different
positions on the front and back of the Z axis, and
can be folded.
Install Limit switch for Z axis
Easier to replace the platform and adjust the belt
Y-axis bottom profile

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents