DMJOIL101EN - v1
2. PREPARE MAIN PROFILE
2.1 DRILLING
Fig.
2.1
Fig.
2.3
2.2 TRACK PROFILE ASSEMBLY
2.2.1 Introduce.
Fig.
2.4
1. Track profile
2. Insulation profile
Fig.
2.4
Length = AT-20mm
Length = AT-20mm
VISIO L1H OPERATOR - INSTALLATION MANUAL
Drill hole size Ø9 along main profile as shown in
diagrams.
2.2.2 Position.
Keep a distance of 10mm to the right and left of the
main profile.
7
Space drill holes
Fig.
Herramientas
Tools
Broca nº9
Drill bit no.9
Fig.
2.1
Fig.
2.2
10 mm approx.
2.5
Fig.
2.5
Fig.
2.2