Download Print this page

Manusa Op. Visio L1H Installation Manual page 4

Advertisement

DMJOIL101EN - v1
1. INSTALLATION DIMENSIONS AND CHECKS
1.1 LEGEND AND FORMULAE
Abr
DESCRIPTION
HL
DOOR CLEAR HEIGHT
PL
DOOR CLEAR WIDTH
AT
OVERALL OPERATOR WIDTH
HM
SLIDING LEAF HEIGHT
HF
FIXED LEAF HEIGHT
AM
SLIDING LEAF WIDTH
AF
FIXED LEAF WIDTH
HV
BEAM HEIGHT
HT
OVERALL DOOR HEIGHT
HR
MINIMUM CEILING HEIGHT
Dt
TOTAL DOOR DEDUCTION
S2
MINIMUM SAFETY DISTANCE HEAD AND BODY
S1
MINIMUM SAFETY DISTANCE HANDS AND FINGERS
Sp*
OVERLAP FIXED LEAF / SLIDING LEAF
Dop *
OPERATOR DEDUCTION
Dop *
Operator deduction depending on frame:
Frame 20,30,35,40
= 50
Frame 44
= 100
Frame SOS 44
= 150
1.2 INSTALLATION DIMENSIONS
VISIO L1H OPERATOR - INSTALLATION MANUAL
FORMULA
HM=HL
HF=HL
AM=PL+Sp
AF=AH-PL
HV=HL+28
HT=HL+125
HR=HT+(5 min)
Dt=Dop+S1+S2
AS PER DET 2.4.1
AS PER DET 2.4.2
DEP. ON FRAME
DEP. ON FRAME
Sp*
Overlap between door leaves depending on
frame:
Frame 20,30,35,40
= 40
Frame 44
= 95
Check that the dimensions correspond to the order.
(See delivery note.) AT x HL ; PL
Fig.
1.1
AH, Opening Width =
HV, Beam Height =
Fig.
1.1
4

Advertisement

loading

Related Products for Manusa Op. Visio L1H