Download Print this page

Manusa Op. Visio L1H Installation Manual page 13

Advertisement

DMJOIL101EN - v1
5. FIXED LEAVES / BOTTOM LINTEL (PL) ASSEMBLY
5.1 MOUNT FIXED LEAVES
5.1.1 Drill.
Mark and drill the floor on the inside of the AT in
accordance with dimensions.
Mark and drill with respect to the reference vertical,
according to frame dimensions
Fig.
5.1
Woodw. E20
Fig.
5.1
Fig.
DET
5.2
5.2.1
Woodw. D35
VISIO L1H OPERATOR - INSTALLATION MANUAL
Tools
Nuts & bolts
Drill bit no. 6
DIN912 6x20
Fig.
DET
5.2.2
Woodw. I30
13
Nuts & bolts
Rawlplug S-6
5.2
Variable depending on frame dimensions
Woodw. 40

Advertisement

loading

Related Products for Manusa Op. Visio L1H