Download Print this page

Manusa Op. Visio L1H Installation Manual page 22

Advertisement

DMJOIL101EN - v1
8. GUIDE AND SLIDING LEAF ASSEMBLY
8.1 FLOOR GUIDES ASSEMBLY
8.1.1 Mark and drill the floor.
Fig.
8.1
Fig.
8.2
Fig.
8.4
VISIO L1H OPERATOR - INSTALLATION MANUAL
Floor guides position. (On the side of the fixed leaf as
shown in the diagram)
Mark the floor, using the metal guide as a template.
Fig.
8.2
Position the guide as shown in the diagram.
Drill the floor in accordance with the marks.
22
Fig.
8.1
Fig.
8.3
Fig.
8.4
Fig.
8.3

Advertisement

loading

Related Products for Manusa Op. Visio L1H