1.3.2 Door height.
HL
Door clear height
HT = HL + 125
Overall door height
HR = HT + (5min) Minimum ceiling height
HV = HL + 28
Beam height
Fig.
1.5
Fig.
1.6
1.4 CHECKS
Fig.
1.5
Fig.
Fig.
1.7
Fig.
1.8
Fig.
6
VISIO L1H OPERATOR - INSTALLATION MANUAL
DET
1.6
DET
1.6.1
Check the floor level, beam and walls overhang.
FIG
Fig.
1.7
Check AH for the whole opening as per Fig 2
Fig.
1.8
Check that minimum HV = HL+28 for the whole
opening