Load Cell Connection - Cardinal SMARTCELL 825D Installation And Technical Manual

Table of Contents

Advertisement

Load Cell Connection

The Homerun Cable is installed between the first load cell in the loop (Start Node) and the
825D indicator. It is made from five conductors, shielded PVC cable, and terminated with the
included 5-pin actuation lever-type connector from the Homerun Cable Connector Pack. Refer
to the table below for cable and connector information.
Cable and Connector Information
HOMERUN CABLE, 5 CONDUCTORS, SHIELDED PVC
(CONTAINS 2 x 18AWG, 2 x 22AWG, AND 1 x 22AWG)
BAGGED CONNECTOR AND INSTRUCTION SHEET
(
INCLUDES 5-PIN ACTUATION LEVER TYPE CONNECTOR, 6610-1308
IMPORTANT: Clean the load cell connectors and the homerun connector plug
with electrical contact cleaner, and then apply dielectric grease to the homerun
connector plug before installing it into the load cell connector.
1. Dis-assemble the connector (unscrew the black plastic part of the connector from the metal
part), and then slide the black plastic part onto the homerun cable.
2. With the homerun cable routed through the black plastic part of the connector, remove
approximately 1 inch (25 mm) of the cable's outer jacket, exposing the internal wires.
3. Next, remove approximately 5/16 inch (8 mm) of insulation from each of the five wires.
NOTE: The hex part of the black plastic cable clamp is approximately 5/16
inches (8 mm) and can be used as a guide for stripping the wires.
≈ 5/16 inch
(8mm)
ITEM and DESCRIPTION
8545-0980-0M Rev C • 825D Weight Digital Indicator
CARDINAL PART NO.
6980-1092
3502-0681-0A
)
1 inch (25 mm)
≈ 5/16 inch
(8mm)
9

Advertisement

Table of Contents
loading