Operations; Button Operation; Screen Description - PROLiNK Master II Series User Manual

Online ups
Hide thumbs Also See for Master II Series:
Table of Contents

Advertisement

3. Operations

3-1. Button Operation

1) Before operation, make sure that the two strings of batteries are connected correctly in order
of "+,GND,-" terminals and the breaker of the battery pack is at "ON" position (only for long-run
model).
2) Press the "
mode. After initialization, UPS will enter into "No Output mode".

3-2. Screen Description

After initialization, the LCD will display main screen. There are five sub-menus: Control, measure, setting,
information and data log. Touch any sub-menu icon to enter into the sub-screen.
STARTING
HOME
" button to set up the power supply for the UPS. UPS will enter into power on
ON/OFF UPS
BATT TEST
MUTE ALL
CONTROL
LCD CHANGE
EXIT PARALLEL
Page one
Page tow
MEASURE
page three
GENERAL
SETTING
ADVANCE
BASIC
RATED
INFO
PARAMETER
DATALOG
Page one
Page tow
password:0000
user
password:****
Maintenance
Menu tree
9
ELECTRIC
BATT
OTHERS
SYS PARA
INSTALL
VOL CALI
CURR CALI
INITIAL
DATA LOG
ELECTRIC
PARAMETERS
BATT
CALI
OTHERS
EEPROM
SELFTEST
TOUCH CALI

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro-83300qrsPro-83300qrl

Table of Contents