Quectel EM05-G Hardware Design page 31

Lte standard module series
Table of Contents

Advertisement

LTE Standard Module Series
EM05-G Hardware Design
A reference circuit is shown in the following figure.
Module
1.8/3.3 V
10K
FULL_CARD_POWER_OFF#
Figure 10: Turn on the Module Automatically
The timing of turning on the module is illustrated in the following figure.
Note
VCC
RESET#
1.19 V V
4.4 V
IH
FULL_CARD_POWE R_OFF#
V
0.2 V
IL
12 s
Module State
OFF
Booting
Active
Figure 11: Timing of Turning on Module
NOTE
Make sure that VCC is stable before pulling up FULL_CARD_POWER_OFF# pin. The time between them
is no less than 30 ms.
EM05-G_Hardware_Design
30 / 69

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents