Siemens MOBILETT Plus Service Instructions Manual page 103

Hide thumbs Also See for MOBILETT Plus:
Table of Contents

Advertisement

Mechanical systems
Fig. 29
Install the new friction linings according to (Fig. 29 or Fig. 30). There are two different
vertical friction linings. Both are equally suitable for the unit.
Reinstall the upper counter bearing.
Tighten the screws.
Check that there is no braking action on the counter bearings.
Tighten the adjustment screw. Make sure that the spring mechanism is under tension
before releasing the ceiling support.
Attach the column cover and side covers and the cover with the cassette compartment.
Check parallelism, refer to section "Parallelism".
Adjust counterbalance, refer to section "Counterbalance".
Adjust friction linings, refer to section "Adjusting the friction linings".
Siemens-Elema AB
Solna, Sweden
Fig. 30
SPR8-215.898.02
Rev. 01
01.02
Page 27 of 28
MOBILETT Plus/ Plus E
SPS-UD
10 - 27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mobilett plus e320010900

Table of Contents