Chapter 5: Installing The Vsp 4450Gtx-Ht-Pwr; Installation Checklist; Installation Fundamentals - Extreme Networks ExtremeSwitching Virtual Services Platform 4450GTX-HT-PWR+ Installation Manual

Table of Contents

Advertisement

Chapter 5: Installing the VSP 4450GTX-HT-

Installation checklist

Use this checklist to install the VSP 4450GTX-HT-PWR+.
No.
Task
1.
Install the VSP 4450GTX-HT-PWR+.
2.
Install the primary or redundant
power supply.
Important:
A combination of AC-input and
DC-input power supplies in the
same chassis is not supported.
3.
Check the LEDs to verify the
installation.

Installation fundamentals

The following section describes the installation fundamentals for the VSP 4450GTX-HT-PWR+
model.
VSP 4450GTX-HT-PWR+ model
The VSP 4450GTX-HT-PWR+ model consists of:
1. 48 10/100/1000 Mbps RJ45 ports with PoE+
August 2018
PWR+
Installing the Virtual Services Platform 4450GTX-HT-PWR+
Description
You can install the switch in two ways:
Installing the Virtual Services Platform 4000
on a table or shelf
on page 21
Installing the Virtual Services Platform 4000
in an equipment rack
For the procedure to install power supply, see
Installing the VSP 4000 Series PWR power
supply
on page 27.
For a description of the LEDs, see
Emitting Diode (LED) on VSP 4000
page 32.
on page 22
Check Light
on
Table continues...
16

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ExtremeSwitching Virtual Services Platform 4450GTX-HT-PWR+ and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Ec4400a03-e6

Table of Contents